• Home
  • Archive by category "Iraq"

Lube and Transformer Oil Testing Contract in Iraq

Enquiry:

TEPRH is hereby inviting you to this Request for Information (RFI) related to provision of Lubricant Oil Analysis.

We want to know if you’re capable of providing attached scope of work services for our operations in Iraq :

  1. Supplier to confirm if it can deliver attached requirements? If supplier can only provide partial of the scope, please advise specifically which part of the scope it can provide;
  2. Supplier shall clearly specify whether the services can be provided in preferably Basra, other locations in Iraq or in Middle East;
  3. Supplier shall provide previous experience relevant to the subject scope of services;
  4. Any prior experience providing services to TEPRH.

APPLICABLE STANDARDS
Testing shall be conducted in accordance with the latest edition of applicable standards
including but not limited to:
IEC 60599
IEC 60156
IEC 60422
IEC 60814
IEC 62021
IEC 60247
IEEE C57.104
ASTM D1816
ASTM D1533
ASTM D971
ASTM D445
ASTM D2896
ASTM D664
ASTM D6304
ASTM E2412
ASTM D7593
ISO 4406
ISO 17025 – Guidance for interpreting dissolved gas analysis (DGA) – Determining the dielectric breakdown voltage of insulating liquids at
power frequency – Supervision and maintenance guide for insulating oils – Water content determination in insulating liquids – Determination of acidity in insulating liquids – Insulating liquids permittivity dielectric factor – Guide for the interpretation of gases generated in mineral oil – Standard test method for dielectric breakdown voltage – Standard test method for water in insulating liquid – Standard test method for interfacial tension – Standard test method for kinematic viscosity – Standard test method for base number – Standard test method for acid number – Standard test method for determination of water – Condition monitoring of used lubricants using Fourier Transfer
Infrared (FTIR) – Fuel dilution for in-service engine oils – Cleanliness code chart & guide – Accredited laboratory requirement

  1. LABORATARY TESTING REQUIREMENTS
    Laboratory analysis in accordance with applicable standards in section.6, or equivalent
    international standards. The tests below are not intended to limit or restrict the scope of
    activities.
    7.1.
    Testing requirements of transformer oil
    The CONTRACTOR shall perform in accredited laboratory of applicable:
    7.1.1. Dissolved gas analysis (DGA)
    Perform DGA to evaluate incipient thermal and electrical faults within transformers.
    Analyse and report concentrations of:
    o Hydrogen (H2)
    o Methane (CH4)
    o Ethane (C2H6)
    o Ethylene (C2H4)
    o Acetylene (C2H2)
    o Carbon Monoxide (CO)
    o Cabon Dioxide (CO2)
    o Oxygen (O2)
    o Nitrogen (N2)
    Provide fault interpretation using methods such as:
    o IEC 60599
    o Duval triangle
    o Rogers ratio
    o IEEE C57.104
    7.1.2. Dielectric breakdown voltage (BDV)
    Determine the dielectric strength of transformer oil accordance with IEC 60156 or
    equivalent standards. The report shall include:
    o Individual test results
    o Average breakdown voltage
    o Acceptability assessment
    o Recommended corrective actions
    7.1.3. Moisture content analysis
    Determine the water content using Karl Fischer titration techniques and report:
    o Moisture content (ppm)
    o Saturation percentage
    o Impact on insulation performance
    7.1.4. Acidity test (TAN)
    Determine:
    o Total acid number (TAN)
    o Oxidation status of oil
    o Sludge formation tendency
    7.1.5. Interfacial tension (IFT)
    Measure and evaluate:
    o Oil contamination level
    o Oxidation by-products
    o Remaining oil condition
    7.1.6. Dielectric dissipation factor / Tan delta
    Determine:
    o Dielectric loss factor
    o Insulation deterioration
    o Presence of contaminants and aging products
    7.1.7. Furan analysis
    Perform analysis of furanic compounds to assess paper insulation degradation and
    estimate remaining insulation life.
    7.1.8. Oil physical properties
    Determine and report:
    o Appearance and color
    o Density
    o Flash point
    o Viscosity
    o Sediment and sludge content
    7.1.9. Conditional assessment and engineering evaluation
    The CONTRACTOR shall provide a comprehensive engineering assessment including
     Transformer health assessment, evaluating
     Oil condition
     Paper insulation condition
     Presence of thermal faults
     Presence of electrical discharges
     Presence of arcing faults
     Risk level of transformer operation
     Trend analysis with the historical records for
     Year to year comparison
     Trending graphs
     Fault development assessment
     Remaining service life indication
     Practical recommendations such as
     Continue in service
     Increased monitoring frequency
     Oil filtration
     Oil reclamation
     Oil replacement
     Transformer outage requirements
     Further diagnostic testing
    7.2.
    Testing requirements of Engine lubricating and Hydraulic oils
    The CONTRACTOR shall perform in accredited laboratory of applicable:
    7.2.1. Oil condition monitoring
    o Kinematic viscosity @40oC and 100oC
    o Viscosity index
    o Total base number (TBN)
    o Total acid number (TAN)
    o Oxidation
    o Nitration
    o Sulfation
    o Remaining additive package assessment
    7.2.2. Wear metal analysis
    Quantitative determination of wear metals including:
    o Iron (Fe)
    o Chromium (Cr)
    o Aluminum (Al)
    o Copper (Cu)
    o Lead (Pb)
    o Tin (Sn)
    o Nickle (Ni)
    o Silver (Ag)
    7.2.3. Contamination analysis
    o Silicon (dust ingress)
    o Sodium (Na)
    o Potassium (K)
    o Cooling water contamination indicators
    o Water content (Karl Fischer)
    o Fuel dilution
    o Glycol contamination
    o Particle contamination
    7.2.4. Cleanliness assessment
    o ISO4406 cleanliness code
    o Particle count analysis
    o Debris and ferrous wear particle analysis
    7.2.5. Advanced diagnostic tests – as and when required
    o FTIR spectroscopy – to identify organic and inorganic materials, characterising
    chemical functional groups, and detecting molecular structural changes in solids,
    liquids, and gases
    o Analytical Ferrography – to identify wear particles, their composition, and their
    origin by visually analysing them microscopically
    o Rotrode filter spectroscopy (RFS) – to detect large wear and contamination
    particles
    o Microscopic wear particle examination
    o Root cause failure investigation

One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Multiple Instruments Calibration Contract in Baghdad, Iraq

Enquiry:

Our company at Iraq is seeking qualified subcontractors for the provision of Instrumentation Calibration Services.

Please find attached the following documents for your review and submission:

SCOP OF WORK 1.docx

Technical Data.docx

Technical Questions (Calibration).xlsx

Pricing Table.xlsx

Kindly submit the following:

Technical proposal addressing the scope and technical requirements.

Completed Technical Questions (Calibration).xlsx.

Completed Pricing Table.xlsx with your commercial offer.

Copy of ISO/IEC 17025 accreditation certificate.

Copy of ISO 9001 certificate (if available).

Company profile and relevant Oil & Gas calibration experience.

–              Our Terms and Conditions of Payment:

–              Payment will be made via bank transfer only (through business bank account not personal).

–              No cash payments will be processed under any circumstances.

–              Our payment term is 30 net days from the invoice date

Kindly submit your comprehensive proposal by Thursday, __________.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Sampling, Analysis of Pressurized Process Fluid Gas Stream in Iraq

Enquiry:

Sampling and Analysis of Pressurised Process Fluid (Gas Stream) from Upstream Air cooler

Qty: 1 CYLINDER.

1. Purpose

The purpose of this Scope of Work is to investigate the process fluid upstream of Air Cooler to determine the presence and quantity of water in the stream and evaluate its potential contribution to corrosion and deposition issues. The investigation will also confirm the presence of elemental sulfur and all spectrum composition, quantify and characterize any solids present, and provide information to support equipment integrity assessment and future mitigation actions.

2. Objective

The external laboratory is requested to perform a detailed analysis to

determine:

• Determine the water vapour content of the overhead gas upstream of Air Cooler using ASTM D5454 or an equivalent validated method. Report the result in ppmv and mg/Sm³ or lb/MMscf, as applicable.

• Determine whether elemental sulfur and all spectrum elemental present in the process fluid.

• Determine process gas composition using Gas Chromatography. to support phase behavior modelling and identification of potential hydrocarbon and water condensation locations between the Stabilizer Overhead tower until Downstream cooler.

• Determine or calculate the water dew-point temperature at the actual operating pressure and at agreed reference pressures. The basis, method, software or equation used shall be stated in the report.

• Quantify and characterize any suspended solids. using XRD method.

Determine total

particulate / solids loading in the process gas using a validated filtration (Example pore

0.45 or 1 micron) and gravimetric method. Report results in mg/m³.

• Identify the chemical composition and structure of the solids.

3. Sample Information

• Sample Type: Pressurized process fluid sample (gas stream).

• Source Location: Upstream of Air Cooler • Facility: PF-1 Stabilizer System • Special Requirement: Sample shall be collected under pressure and protected from air exposure during sampling, transportation, and laboratory handling to prevent oxidation and sulfur formation.

4. Required Laboratory Tests

4.1 Fluid Characterization

• Water content determination.

• Visual inspection for solids and sulfur deposition.

• Confirmation of elemental sulfur presence, if any.

4.2 Solids Analysis

If solids are present:

• Total solids quantification.

• Chemical composition analysis.

• Structural/mineralogical analysis using suitable analytical techniques such as XRD, SEM-EDS, FTIR, or equivalent.

• Identification of corrosion products, sulfur species, salts, and other inorganic compounds.

5. Reporting Requirements

The final laboratory report should include:

• Water content results.

• Confirmation of elemental sulfur presence or absence.

• Quantity of solids identified.

• Detailed chemical and structural characterization of solids.

• Interpretation of solids formation mechanism.

• Raw data + interpreted results in PDF and Excel formats

1. Timeline & Deliverables

• Turnaround Time: 2 – 4 weeks starting from sample submission.

• Deliverables:

• Full analysis report (PDF)

▪ Raw analytical data (Excel)

▪ Any supporting images (FTIR, XRD patterns)

2. Third-Party Laboratory Requirements

• The laboratory shall:

▪ ISO 17025 accreditation. The third-party laboratory shall be accredited to ISO/IEC 17025 for the applicable analytical methods. Where a required analysis is outside the laboratory’s accredited scope, this shall be clearly declared in the technical proposal and final report.

▪ Review the scope and analytical requirements.

▪ Lab shall provide a detailed description of the analytical procedures or reference to Standards and analytical schedule for review ▪ Lab shall also communicate to the minimum required sample volumes / quantity.

3. Reporting

• Final report including:

o Executive summary.

o Detailed findings per sample.

o Tables, graphs, and chromatograms


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Glass Transition Temp Tg Testing by DSC in Iraq

Enquiry:

I would like to inquire whether your laboratory provides Glass Transition Temperature (Tg) testing by Differential Scanning Calorimetry (DSC) in accordance with ISO 11357-2 or an equivalent method.

As per our project specification, the Tg test is required to determine the degree of curing of the resin. The specification requires that the measured Tg shall be more than 30°C above the maximum design temperature. Our maximum design temperature is less than 100°C.

Could you please confirm whether your laboratory is capable of performing this test as per the above requirement?

Additionally, kindly provide your technical datasheet for the DSC equipment, including the applicable testing range, sample requirements, and other relevant technical details.

Looking forward to your response.

Note: If your laboratory is not capable of conducting this testing, please let us know if you can recommend or provide the contact details of another laboratory in Iraq, preferably in Basra or elsewhere in Iraq, that is capable of performing the required testing.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Major Enquiries Processed in May, 2026

Here is list of major enquiries that we have processed in the month of May, 2026.

Write us today should you have similar requisites: [email protected]

  • Water Samples Testing in Dubai, UAE       
  • Water and Microbiological Testing in Riyadh, KSA       
  • Metal Strips Testing SEM/EBSD in Europe       
  • Repair, Calibration of Pressure Calibrator in UAE       
  • DGA Inhouse Training in Europe and UAE       
  • Gas Purity Testing in UAQ, Dubai, Port Khalifa, UAE       
  • BBQ Charcoal and Vinegar Testing in UAE       
  • Mercedese Used Engine Oil Testing in Kuwait       
  • Vessel Fuel Oil and Fresh Water Testing as per ADNOC, UAE       
  • Water Testing for Water Treatment Plant in Al Safaniya, KSA       
  • Machine Hydraulic Oil Testing in KSA       
  • Seawater Testing in Riyadh, KSA       
  • Base Oil Saturates Testing in Egypt       
  • Marine Diesel Oil Testing in Turkey       
  • BWTS System Annual Inspection in Abu Dhabi, UAE       
  • Indoor and Outdoor Air Quality Testing in Muscat, Oman       
  • Spectrophotometric Lab Testing in Kuwait       
  • Crude Oil Testing in Yanbu, KSA       
  • Re-Labelling Inspection in Dammam, KSA       
  • Emission, Water, Environmental Testing in Pakistan       
  • Drinking Water Quality Testing in Riyadh, KSA       
  • Molten Zinc Analysis in Jubail, KSA       
  • Liquid Fertilizers Testing as per SEWA in KSA       
  • VISCO Elastic Coating Testing in Iraq       
  • Diesel Quality Testing as per ADNOC, Dubai, UAE       
  • Water Testing in Rotterdam, Europe       
  • Air Quality, Noise, Water Testing in Sharjah, UAE       
  • Diesel Tank Inspection in Ras Al Khaimah, UAE       
  • Ballast Water Sampling and Testing in Port Said, Egypt       
  • Waste Water Testing in Al Malaz Riyadh, KSA       
  • Deflection Test of GRP Pipes in Mussafah, UAE       
  • Bunker Remaining Onboard BROB Survey at El Dekheila, Egypt       
  • Chiller Oil Testing in Abu Dhabi, UAE       
  • Asbestos Testing in Hilla, Karbala, Iraq       
  • Frying Oil Testing in Malta, Europe       
  • GCIR Emulsifier Performance Test in Dammam, KSA       
  • Calibration of Equipment in Yanbu, KSA       
  • Underground Water Tank Inspection in Dammam, KSA       
  • Microbiological Testing Annual Contract in Riyadh, KSA
get a quote

Get a Quote Today
Instant response!
[email protected]
Middle East – Far East – Africa – Europe – America – Australia – Asia

contact today

Diesel Fuel Testing in Iraq

Enquiry:

We are contacting your laboratory to inquire about your testing services and to explore the possibility of future cooperation.

Specifically, we are seeking an ISO/IEC 17025 accredited laboratory capable of performing testing on diesel fuel samples.

We would appreciate it if you could kindly confirm whether your laboratory is accredited in accordance with ISO/IEC 17025.

If so, please provide the following information:

  1. A copy of your valid ISO/IEC 17025 accreditation certificate.
  2. Your current scope of accreditation, including accredited test methods and parameters.
  3. Details of the testing services available for diesel fuel, particularly:
    • Flash Point
    • Density
    • Kinematic Viscosity / Dynamic Viscosity
    • Any other petroleum product testing services available.
  4. A quotation or price list for each test.
  5. The required sample quantity for each test.
  6. The expected turnaround time for reporting results.
  7. Information regarding any opportunities for long-term cooperation, subcontracting arrangements, or technical collaboration.
  8. Details of any discounts or special commercial terms available for multiple samples, multiple test requests, long-term agreements, or regular testing volumes.

We are interested in establishing cooperation with reliable ISO/IEC 17025 accredited laboratories for testing services, subcontracting activities, and potential future collaboration.

Kindly provide your best technical and commercial offer, including any available volume-based discounts and relevant information regarding your laboratory capabilities and services.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Transformer Oil Leakage Certification in Duqm, Iraq

Enquiry:

We kindly request you to submit your quotation for the following scope of work under Purchase Request: ——————–:

Scope of Work for Transformer oil BDV test/analysis.

DescriptionPurchase RequestQuantityUoM
Mobilization/Demobilization charges from  Muscat to Duqm Site and Back.1.00UN
Service charges for Oil leak Arresting of 1000  kVA, SL No. transformer at Duqm site  as per scope of work1.00UN
Service charges for Oil leak Arresting 1000  kVA, SL No. transformer at Duqm site  as per scope of work1.00UN
Service charges for Oil leak Arresting of 2000  kVA, SL No. transformer at Duqm site  as per scope of work.1.00UN
Service charges for Oil leak Arresting of 2000  kVA, SL No. transformer at Duqm site  as per scope of work.1.00UN
Service charges for Oil leak Arresting of 2000  kVA, SL No. transformer at Duqm site as  per scope of work.1.00UN

Commercial Requirements:

  • Provide detailed pricing breakdown for each item.
  • Confirm lead time and availability to execute the work.
  • Include validity of quotation.
  • Specify payment terms.
  • Confirm compliance with the attached/required scope of work.

Deadline to send your offer is 05 June 2026

Kindly let us know the delivery time, delivery type , price discount, and other details .


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

VISCO Elastic Coating Testing in Iraq

Enquiry:

Further to our discussion, please kindly confirm the possibility and quote us the costs for carrying out below tests on VISCO Elastic Coating as per ISO-21089-3 -2016. We need itemized costs and prices for each so we negotiate with our client and get final approval.

itemTestStandard
1Cathodic Disbondment ISO 21809-3, Annex G Voltage: -1500 mV vs SCE Duration: 28 days, Temperature: 23 °CISO-21809-3
2Cathodic Disbondment ISO 21809-3, Annex G Voltage: -1500 mV vs SCE Duration: 28 days, Temperature: 80 °CISO-21809-3
3Cathodic Disbondment ISO 21809-3, Annex G Voltage: -1500 mV vs SCE Duration: 48 hours , Temperature: 65 °CISO-21809-3
4Indentation Resistance ISO 21809-3 Annx E @ 23°CISO-21809-3
5Peel Adhesion ISO 21809-3, Annex H @ 23°C to steel and plant coatingISO-21809-3
6Indentation Resistance ISO 21809-3 Annx E @ 80°CISO-21809-3
7Peel Adhesion ISO 21809-3, Annex H @ 80°C to steel and plant coatingISO-21809-3

One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Asbestos Testing in Hilla, Karbala, Iraq

Enquiry:

Kindly note that we are looking for the following tests for Asbestos contained in the Hilla and Karbala

Please let us know if you could provide the test according to the mentioned standard, and provide your best proposal accordingly

We need 10 tests per location . 20 test combined.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Lab Equipment Calibration in Iraq

Enquiry:

We would like to request a quotation for calibration of our laboratory equipment.

Please include the service scope, lead time, calibration method (on-site/off-site), compliance standards, and full cost breakdown. I can provide the equipment list upon request.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].