• Home
  • Archive by category "Oil and Gas Enquiries"

Oil Testing in Spain, Teruel

Enquiry:

We require fuel/Hydraulic analysis report for the below. Please advise on collection details from Spain.

(1) Fuel – aviation kerosine and diesel – 0.5 percent

(2) Hydraulic oil – mineral and phosphate – 0.3 percent

(3) Synthetic oil which is not approved – 10.0 percent

(4) Mineral oil – 2.0 percent.

per AMM 79-00-00-280-805-A

This is based in Spain/Teruel.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Oil Quality Test for Petroleum Company, Doha

Enquiry:

Please note that we would like to know if the analysis facility for Oil Quality is available in your laboratory for the below listed parameters, as we need to know the price of each test as under :

  1. Membrane Patch Colorimetry ( MPC Varnish ).
  2. Oil Cleanliness.
  3. Ruler test.

One of our ISO certified and accredited lab in Qatar would be taking over this job.

Bunker Survey Standard Operating Procedure SOP

Bunker Survey /Draftt Survey Standard Operating Procedure SOP (Guidelines)

Bunker Inspection Standard Operating Procedure Checklist.

The main purpose of SOP (Standard Operating Procedure) is to provide a step by step guide to conduct bunkering operation with highly ensured safety precautions. Simultaneously its purpose is to provide a certified statement of the quantity and quality of the oil delivered and to draw attention to matters which may be relevant to the protection of the client’s interest.

Bunkering operation lets the bunker owner/captain/producers know the quality, quantity and safety measures applied into the oil cargo and vessel itself.

Here is a checklist to conduct bunkering operation.

Surveyor’s Responsibility in General

To discharge number of responsibilities to the above described purpose, the surveyor must be focused towards applying and recording each and every moment and reporting it to persons concerned.

Here is a complete list referring to this SOP:

1.Bunker Survey Practical Procedures

2.Essential Equipment for bunkering Survey

  • Surveyor Procedures
  • Time Sheet
  • Checks on Receiving Vessel
    • Acknowledgment to Pre-Survey
    • Draught, Trim and List
    • Vessel’s Information
    • Chief Engineer Witnessing for Bunker Tanker
    • Vessel’s Calibration Tables
    • Onboard Quantity Measurement
    • Gauging Criteria
    • Free Water Check
    • Temperature Check
  • Checks on Bunker Tanker
    • Pre-Survey Acknowledgement
    • Draught, Trim, List
    • Bunker Requisition Form
    • Bunker Tanker Calibration Table
    • Onboard Quantity Measurement
    • Gauging Criteria
    • Free Water Check
    • Temperature Check
    • Stock Movement Report
    • Flow Meter
    • Tank Measurement/Calculation
    • Delivery Procedure
  • Post Delivery Procedure
    • Bunker Tanker
      • Tank Measurement
      • Tank Gauging Witnessing
      • Determination of Delivered Quantity
  • Receiving Vessel
    • Tank Measurement
    • Determination of Received Quantity

3. Sampling

  • Sample Location
  • Checking and Verification of Sampling Equipment
  • Sampling Procedure

4. Disputes

5. Reporting Requirements

  • Precautions and Limitations