Treatment Plant Waste Water Testing in KSA

Enquiry:

I have  three projects for your laboratory. In this case they will be waste water plants from Tabuk, Buraydah and Madinah. In that plants we will need to do also a performance and reliability test of 30 days per plant. I would like to ask you for a quotation for the next sampling analytical plan. In each one of that plants we will need to analyze everyday the next parameters attached. Note that this analytical are in Tabuk, if we need to sent them to other place you need to include the logistic costs.

The plant Will be a Waste water treatment plant so:

  • Inlet: Wastewater
  • Beneficial Sludge: Sludge
  • TSE: Treated Water
  • Screenings: Sludge
  • Grit: Sludge

The parameters to analyse in every area are mentioned in the excel attached.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].