• Home
  • Archive by category "Tank Calibration"

Tank Calibration, Indoor, Outdoor Air Quality Test, UAE

Enquiry:

Please quote the best competitive price for the below

      1. INDORE & OUTDOOR AIR QUALITY & NOISE LEVEL TEST    -     1 Nos

      2. DIESEL TANK INSPECTION AND CERTIFICATION(19000 GL)     -     1 Nos


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Third Party Certificate for Diesel Tank in Dubai, UAE

Enquiry:

With regards to the above-mentioned subject and project, kindly provide your quotation with final price for THIRD PARTY CERTIFICATE FOR DIESEL TANK as per below description.

5000 Gal Diesel Tank Inspection and Certification – DCD Approved.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Diesel Tank Inspection for Civil Defense Approval, UAE

Enquiry:

I am contacting you to inquire about your diesel tank inspection services.

Kindly provide the following information:

  • Confirmation of your Civil Defense approval for diesel tank inspection in Abu Dhabi
  • Scope of inspection services offered
  • Your earliest availability for the inspection this week or next
  • Quotation for the inspection of our diesel storage tank

One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Storage Tanks Calibration in Turkmenistan

Enquiry:

Currently, our company is expecting a project related to storage tank calibration, and therefore we are seeking for partners with ISO/IEC 17020 accreditation & with respective valid license.

Please provide your engineer’s daily rates and how many days it may require for him (them) to complete calibration of 1 x tank (as per below list).

Mobilization & demobilization, visa support (Turkmenistan visa), local accommodation and transfer, catering would be our cost.

Below, I have given a brief scope. I have also attached a sample of previous job method of statement, just for your information.

CALIBRATION OF STORAGE TANKS:

1. Contractor shall perform calibration and verification of storage tanks, specified in Appendix II, in accordance with ISO 7507/4, Petroleum and Liquid Petroleum Products — Calibration Of Vertical Cylindrical Tanks Using Internal Electro‐Optical Distance‐Ranging Method).

2. Contractor shall determine the reference height of storage tanks.

3. Contractor shall have valid certificate accredited in accordance with ISO/IEC 17020 standard or international standard recognized by Turkmenstandartlary (TDS) with scope of accreditation to perform calibration of vertical cylindrical tanks using Internal electro‐optical distance‐ranging method (ISO 7507/4)

4. Contractor shall provide services utilizing contractor’s own materials, inventory, equipment, tools, and other costs necessary for the provision of services.

5. Contractor shall provide two copies of calibration tables approved by TDS in accordance with the TDS 1006‐2017.

6. Contractor shall provide calibration table within two (2) weeks upon completion of work.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Water Tank Calibration in Dubai, UAE

Enquiry:

We are currently working on a Waterdraw Solution that will be kept in our facility. This system will consist of Specific Volume Tank in which will be used for the calibration of our provers. The system’s main component is the tanks calibrated against its volume.

The plan is for us to fabricate a Stainless-Steel Tank and send it to you for Calibration. Please confirm if this is within your scope of work. 


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Third Party Inspection Drawing stamping for chemical storage, UAE

Enquiry:

Please quote the your Best Price for for the drawing stamping as per ADCD requirement for the same approval. following facilities required to add.

  • Diesel Storage Facility                     5000lts capacity                               01 nos.
  • HCL storage tanks                            15 tons capacity                                02nos.
  • Chemical Process area with tanks for  surface preparation activity      02nos.
  • Chemical Process area with tanks for surface preparation activity      01nos.

Also provide Third party inspection services for the same.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].