Contract Water Testing in Qatar

Enquiry:

Please find the following table for your kind consideration. Kindly quote us your best price with a delivery date for the following.

See attached specs

  1. Comprehensive contract for water quality test including chemical supply

Please provide the following terms and conditions:

  • Quotation to be valid for 90 days.
  • The delivery period to be mentioned.

FOLLOWING AREA’S ANDNUMBER OF TEST POINTS ARE:
A. HOSPITAL BUILDING – WATER TESTING AND RECOMMENDATIONS AS FOLLOWS:
(TOTAL OF 136 TEST POINTS)

  1. MONTHLY AND QUARTERLY TEST
    • LEGIONELLA = 73 points
    • PSEUDOMONAS = 29 points
    • E. COLI / TOTAL COLIFORM = 4 points
    • AND DOMESTIC WATER CHEMICAL TEST = 4 POINTS
  2. QUARTERLY TEST
    • TBC = 29 points
    • HETEROTROPHIC PLATE COUNT (HPC). = 1 point
    B. SERVICE BUILDING – MONTHLY WATER TESTING WITH RECOMMENDATIONS
    INCLUDING SUPPLY ANDDELIVERY OF RECOMMENDED CHEMICAL ( TOTAL OF 9
    TEST POINTS):

• STEAM BOILER
• HOT WATER (HEAT EXCHANGER) CHEMICALS
NOTE:
LEGIONELLA – 1 SAMPLE POINT IS EQUAL TO 1 LITER VOLUME OF SAMPLE
PSEUDOMONAS – 1 SAMPLE POINT IS EQUAL TO 500 ML. VOLUME OF SAMPLE
C. SAMPLING BOTTLES AND PPE’S SHOULD BE SUPPLY BY THE CONTRACTOR.
D. WATER SAMPLE COLLECTED SHOULD BE SENT TO LABORATORY AFTER 2 HOURS
FROM TIME OF COLLECTION FOR TESTING.
E. LABORATORY TESTING COMPANY SHOULD BE APPROVED BY MOPH FOR TESTING
OF LEGIONELLA AND PSEUDOMONA

One of our ISO certified lab would be taking over this contract as per Muncipality specifications & ISO standards.