Enquiry:
We have two auxiliary transformers installed at PG Plant. In accordance with the maintenance schedule, transformer
oil needs to be tested. Below are the details of the test.
- DGA
- Dielectric Test
Transformer details as under.
- Auxiliary Transformer 2000Kva/6300V/400V
- Auxiliary Transformer 1250Kva/6300V/400V
One of our highly proficient and ISO certified laboratory would be taking over this testing.