• Home
  • Archive by category "Malaysia"

Firefighting Foam Test, Control Valves Inspection in Malaysia

Enquiry:

Kindly quote us with your best price, availability, validity terms & condition for performing 5 year produced foam test accordingly to below requirement:

  • 5-Year Maintenance Test of Fixed Foam Extinguishing System covering Deck (Maker: NK/ Distribution Lines: 1/ Foam Monitors: 9)

·         five-Year Maintenance (according to last MSC.1/ Circ. 1432) including internal inspection of all control valves

·         all foam proportioners or other foam mixing devices to confirm that the mixing ratio tolerance is within +30 to -10% of the nominal mixing ratio defined by the system approval  à Produced Foam Sample to be taken. Do you have an approved lab for performing the 5-year produced foam test?

·         flush all high expansion foam system piping with fresh water, drain and purge with air

·         check all nozzles to prove they are clear of debris


One of our highly competent and certified lab would be taking over this project.

Glove and Metals Testing Malaysia

Enquiry:

I would like to ask do your company provide a service on: 

1) analyzing glove using chemo test, ASTM D6978

2) heavy metal test on glove – inside the glove; and how much it would penetrate into skin.

3) percentage of vinyl in nitrile (l)

If you do, kindly advise for the procedure and quotation. 


One of our competent lab would be taking over these tests.