Water sampling bottles 1 Liter bottles required in quantity 500 whereas 500ml bottles required in quantity 250. One of our lab items supplier company would be fulfilling this need instantly.
Category: United Arab Emirates
United Arab Emirates
Chiller Compressors Oil Testing
Lube oil testing for chiller compressors on multiple sites on random and periodic basis. One of our associate lab would competentively be coping over this analysis.
Bunker Survey Standard Operating Procedure SOP
Bunker Survey /Draftt Survey Standard Operating Procedure SOP (Guidelines)
Bunker Inspection Standard Operating Procedure Checklist.
The main purpose of SOP (Standard Operating Procedure) is to provide a step by step guide to conduct bunkering operation with highly ensured safety precautions. Simultaneously its purpose is to provide a certified statement of the quantity and quality of the oil delivered and to draw attention to matters which may be relevant to the protection of the client’s interest.
Bunkering operation lets the bunker owner/captain/producers know the quality, quantity and safety measures applied into the oil cargo and vessel itself.
Here is a checklist to conduct bunkering operation.
Surveyor’s Responsibility in General
To discharge number of responsibilities to the above described purpose, the surveyor must be focused towards applying and recording each and every moment and reporting it to persons concerned.
Here is a complete list referring to this SOP:
1.Bunker Survey Practical Procedures
2.Essential Equipment for bunkering Survey
- Surveyor Procedures
- Time Sheet
- Checks
on Receiving Vessel
- Acknowledgment to Pre-Survey
- Draught, Trim and List
- Vessel’s Information
- Chief Engineer Witnessing for Bunker Tanker
- Vessel’s Calibration Tables
- Onboard Quantity Measurement
- Gauging Criteria
- Free Water Check
- Temperature Check
- Checks
on Bunker Tanker
- Pre-Survey Acknowledgement
- Draught, Trim, List
- Bunker Requisition Form
- Bunker Tanker Calibration Table
- Onboard Quantity Measurement
- Gauging Criteria
- Free Water Check
- Temperature Check
- Stock Movement Report
- Flow Meter
- Tank Measurement/Calculation
- Delivery Procedure
- Post
Delivery Procedure
- Bunker
Tanker
- Tank Measurement
- Tank Gauging Witnessing
- Determination of Delivered Quantity
- Bunker
Tanker
- Receiving
Vessel
- Tank Measurement
- Determination of Received Quantity
3. Sampling
- Sample Location
- Checking and Verification of Sampling Equipment
- Sampling Procedure
4. Disputes
5. Reporting Requirements
- Precautions and Limitations

Food testing and labeling Required
Dear Sir/Madame,
We are a start up company that will produce daily freshly squeezed fruit juices distributed in plastic bottles and packed whole fruit cuts and whole fruits (valid for 24 hours only).
Would like to know about the whole process of testing and labeling because we need the products tested for quality assurance and also the nutritional facts labeled.
Please guide us through the whole process with your company as well as costs and expected timings and requirements.