• Home
  • Archive by category "United Arab Emirates"

Hydrostatic Testing of Steel Pipes Yas Island, UAE

Enquiry:

We are currently bidding for a new project “ CONSTRUCTION SERVICES FOR WATER SUPPLY TO SIR BANI YAS ISLAND IN WESTERN REGION“ and invite your esteemed company to submit your techno-commercial quotation for the attached  “PIPE HYDROSTATIC TESTING”. Please find below the attached RFQ document for your kind review.

We kindly request you to submit your best competitive offer on or before 22ND JULY 2026. Your prompt response and support in expediting this process will be highly appreciated. if any query you can contact the undersigned through telecon Mob :______ email.  In case any Scope of Work falls outside your scope of services, you may exclude the same and submit your proposal for the relevant scope only.

Please acknowledge the receipt of the documents and confirm expression to quote by return mail by today.

Project details:

Tender Project Name –         CONSTRUCTION SERVICES FOR WATER SUPPLY TO SIR BANI YAS ISLAND IN WESTERN REGION

Client –                                         ______

Project Duration –                   24 months

Project Location –                   Jabel Dhanna, Abu Dhabi

Project Scope of WorkThe scope of work entails the infrastructure Works package for Pipeline works

Attachment :

  1. BOQ
  2. Terms & condition

Key Commercial Terms:

1Type of ContractHYDROSTATIC TESTING
2Scope of Work“PIPE HYDROSTATIC TESTING” as per the attached BOQ, Specification and Drawings
3Delivery/ Completion Time PeriodThe work shall start as per the mutually agreed schedule during the finalization of the contract.
4Price TermsThe price shall include all cost including as mentioned in the Technical specification.
5Performance BondPerformance Bank Guarantee for 10% of Contract value to be submitted. Refer the detailed “Subcontract terms & condition” enclosed.
6Payment termsPayment shall be made within 60 days from the payment certificate after recovering the advance if any. If any Advance Payment required , Max 10% against advance Bank Guarantee
7EscalationFirm & Fixed for the contract period
8Retention money10% retention will be deducted from each bill.
9Defect Liability period12 months from the date of successful completion of the project.
10Liquidated DamagesIn case job is not completed as per schedule agreed, LD will be applicable as 1% of order value per week, up to max 10% of order value.
11Validity of OfferOffer shall minimum valid for 120 days from the date of offer
12InsuranceIn Seller Scope. Refer the attached “Subcontract Agreement” enclosed.
13Taxes & DutiesAs per UAE tax law
14ComplianceAs per company

One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Storage Tank Civil Defence Certification

Tanks Inspection, Strapping, Certifications

If you’re looking for storage tank calibration and Civil Defense certification, the requirements depend on the country, since Civil Defense authorities have different regulations. We at AccreditedTestLabs.com serve worldwide to facilitate with all local standards and specifications included but not limited to API MPMS Chapter 2, ISO 7507 series, and OIML R71 etc.

In many jurisdictions, the process typically involves:

  1. Storage tank calibration
    • Measuring the tank’s capacity accurately.
    • Producing a calibration (strapping) table showing volume versus liquid level.
    • Performed using recognized standards (such as ISO, API, or OIML methods).
    • Usually carried out by an accredited calibration company.
  2. Inspection
    • Verification of tank dimensions, construction, and condition.
    • Inspection of overfill protection, vents, gauges, and safety equipment if applicable.
  3. Certification
    • The calibration company issues a calibration certificate and calibration tables.
    • If required by local regulations, the documents are submitted to the relevant Civil Defense or fire safety authority as part of the facility approval or renewal process.
  4. Civil Defense approval
    • Civil Defense generally reviews fire and life safety compliance rather than performing the calibration itself.
    • Approval may require:
      • Calibration certificate
      • Tank drawings
      • Inspection reports
      • Fire protection system documentation
      • Site layout and emergency plans

Could you tell us which country you are referring to (for example, UAE, Saudi Arabia, Qatar, Oman, Bahrain, Pakistan, Egypt, America, Rotterdam, or another country)? The specific Civil Defense certification requirements vary by jurisdiction.

Storage Tanks Calibration, Civil Defense Certification

Chilled Water Quality Testing (Pre and Post), Dubai, UAE

Enquiry:

We are currently executing an HVAC project in Dubai and are looking for a qualified company to carry out Chilled Water Quality Testing pre- and post-water quality testing the commissioning process and issue the required Chilled Water Testing Certificate.

Kindly include laboratory analysis, test reports, and certification confirming that the chilled water quality complies with the applicable project specifications and industry standards.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Refuse Derived Fuel RDF Testing in Dubai, UAE

Enquiry:

The objective is to recycle and reuse 75% of waste currently going to landfills.

We generate refuse-derived fuel in our process and would like to check the required parameters as given below

S.No. Tests
1Proximate Analysis 
  Total Moisture, % by mass
  Volatile Matter, % by mass
  Ash content, % by mass
  Fixed Carbon, % by mass
2Ultimate Analysis 
  Total Moisture, % by mass
  Mineral Matter, % by mass
  Carbon, % by mass
  Hydrogen, % by mass
  Nitrogen, % by mass
  Sulphur, % by mass
  Oxygen (by diff) , % by mass
3Gross Calorific valve, K.cal/Kg 
4Net Calorific valve, K.cal/Kg 
5%IM 

Please feel free to contact me for clarifications if any.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Petroleum Sampling Bottles in Abu Dhabi, UAE

Enquiry:

Please quote your best price and the earliest delivery time as per the requirement below.

SNDESCRIPTIONUNITQTY
1SAMPLE BOTTLE   PETROLEUM CAPACITY: 120ML SIZE: 38MM SPEC: CLEAR STRAIGHT WALL FORM OF SUPPLY: 50 EA PER BOX MODEL: 201-04 C MFR.: EASY VACBOX5

NOTES:  

  • Please provide a datasheet & picture of your offered items.
  • Order may be split based on technical acceptance, price, and delivery.
  • In the event of a split order, the unit prices of each line should be final and good for order.
  • MTC and Certificate of Conformity shall be provided along with material delivery.

TERMS AND CONDITION:

  • Price should be quoted in AED/USD.
  • Offer should remain valid for acceptance for a period of not less than 30 days.
  • Please mention the approximate weight and dimensions when packed.

One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Petroleum Sampling Bottles in Dubai, UAE

Enquiry:

We have a requirement as per below specification and quantity. Kindly send us your offer as soon as possible.

Sr #DescriptionQTYUOM
1BOTTLE: TYPE: SAMPLE, PETROLEUM CAPACITY: 120ML SIZE: 38MM SPEC: CLEAR STRAIGHT WALL FORM OF SUPPLY: 50 EA PER BOX MODEL: 201-04 C MFR.: EASY VAC2Box

TERMS & CONDITIONS

  • Ex-works Price / F.O.B Price
  • Manufacturer Name
  • Country of Origin
  • Delivery Period
  • Validity
  • Material Pickup Address
  • Data Sheet / Technical Literature / Drawing
  • Approx. Total Consignment Weight & Volume / Dimensions (L x W x H)

One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Diesel Tank Inspection for Civil Defence in RAK, UAE

Enquiry:

With reference to the above project details, you are hereby requested to provide quotation for

  • Diesel Tank Inspection & Certification for Civil Defense Approval

Capacity: 8,000 gallons

Scope of Activities

1- Visual Inspection

2- NDT and Welding Record review (USE TANK)

3- Calibration of Instruments review

4-Painting Inspection (DFT gauge to be arrange by cunctator)

5-Internal Cleanliness check

6-Detailed Inspection report issued on approved format


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

ACP Fire Rating Testing in UAE

Enquiry:

We require a proposal for fire rating testing of 1 no ACP panel to check whether ACP is fire rated or not.

Please address proposal to,

To: community management

Attention: ——


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].