• Home
  • Archive by category "Chilled Water Test"

Site Inspection of Chilled Water Network in Dubai, UAE

Enquiry:

Kindly find the below attached details. Arrange Site inspection and share Quotation at the earliest.

Supply of Chilled Water Chemicals

1. Corro Guard 33L01 – 32 Kg/drum – 66 Nos

2. Bio Guard 40H06 – 25 Kg/drum –  14 Nos

Chilled Water Chemical Analysis

3. Chilled water report for pH, Conductivity, Total Iron, Total Suspended

Solids, Nitrite as NO2 & NaNO2, TBC & color carried out by EIAC

accredited laboratory.

No. of samples: 1 Sample / Circuit – 14 Nos


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Gear Oil and Chilled Water Testing in Salalah, Oman

Enquiry:

We are a plastic films manufacturing company based in Salalah Free Zone, Salalah, Oman.

Do you provide the services for quality testing of machine’s gear oil and facility’s chilled water? If yes, please get in touch as we have an inquiry for these services.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Chiller Water and Condensed Water Testing in Dubai, UAE

Enquiry:

Reference to the above-mentioned subject, we would like to request for an AMC proposal, as per the below details.

Property NameDubai
Job DescriptionChilled Water and Condenser Water Analysis and Mandatory Tests
Frequency3 months and 2 months
Equipment ScheduleChilled water Chemical analysis every month(Tower A  and Tower B)  Microbiology every 3 month (Tower A  and Tower B) Legionella every 3 month (Tower A  and Tower B)   Condenser water  Chemical analysis every month(Tower A  and Tower B)  Microbiology every 2  month (Tower A  and Tower B) Legionella every 3 month (Tower A  and Tower B)

In line with the above, you can submit proposals for the services mentioned in your trade license.  


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Chilled and Condenser Water Analysis in Dubai, UAE

Enquiry:

Reference to the above-mentioned subject, we would like to request for proposal, as per the below details.

Property NameDUBAI CITY
Job DescriptionChilled Water and Condenser Water Analysis and Mandatory Tests
Frequency3 months and 2 months
Equipment ScheduleChilled water Chemical analysis every month Condenser water  Chemical analysis every month (Site visit is required)

In line with the above, you can submit proposals with your valid trade license for the services mentioned.

PS: Kindly submit your proposal as a response for the same email, without changing the subject line.


One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Chilled and Domestic Water Testing in Dubai, UAE

Enquiry:

Please quote for testing of below scope

Department
Domestic water and chilled water testing
S.No.DescriptionQTYUOM
1Domestic water-Micro(Heterotrophic plate count, Total Coliforms,
Pseudomonas Aeruginosa, Fecal Coliform
Enterococci
15sample
2Domestic water-Legionella Pneumophila, Serogroup 1 and
Legionella serogroup 2 to 14
15sample
3Domestic water-chemical analysis(pH, TDS, Chlorine, #Bromate)15sample
4Chilled water chemical analysis(pH,Conductivity, TDS, Suspended solids, Sodium Nitrite, total Iron)8sample
5Chilled water-Micro(Heterotrophic plate count, Total Coliforms,
Pseudomonas Aeruginosa, Fecal Coliform
Enterococci
8sample
6Chilled water-Legionella Pneumophila, Serogroup 1 and
Legionella serogroup 2 to 14
8sample

One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Water Testing Annual Contract, Doha Qatar

Enquiry:

Kindly share with us your best AMC Proposal to our hotel according to the below scope of work:

SL No.Water testQuantity (samples)Tests RequiredDurationSamples per Year
1Legionella Analysis14 Quarterly456
2Pseudomonas Analysis5 Monthly1260
3Chilled Water System2Turbidity,ph,conductivity-TDS-TSS-T,Hardness,Total Alkalinity,Chloride,Total Iron-Copper-NitriteMonthly1224
4Total Bacteria Count10 Monthly12120
5E coli15 Monthly12180
6Heterotrophic Plate9 Monthly12108
7Fecal Coliform9 Monthly12108
8Domestic Water Chemical Analysis10Turbidity,ph,conductivity-TDS-TSS-T,Hardness,Total Alkalinity,Chloride,Total Iron-Copper-NitriteMonthly12120

One of our highly proficient and ISO certified laboratory would be taking over this job.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].