• Home
  • 2022
  • January
  • 18

Calibration of Storage Tanks, Meters, Gauges, and Testers in Iraq

Enquiry:

Requirement for calibration of below items for one of our end-user project at Basra.

Calibration of Instruments and Standards shall be done using measurement standards traceable to National Standards such as NIST, UKAS other world-recognized accreditation system.

Could you please provide your best calibration charges for below.

Calibration charges
DescriptionManufacturerModel
1Liquid Density TransducerMicro MotionCDM100
2Pneumatic Deadweight TesterPressurementsP3015-BAR-P
3Pneumatic Deadweight TesterPressurementsP3022-MBAR-P
4Hydraulic Deadweight TesterFlukeP3115-BAR
5Hydraulic Deadweight TesterFlukeP3224-BAR
6Digital Reference multimeterFluke8508A
7Multifunction CalibratorFluke5720A
8Digital Temperature IndicatorAmetekDTI-1000A
9Reference SensorAmetekSTS-100 A 250
10Ambient Condition RecorderTesto623
11Volumetric metal field standardsSeraphinSeraphin Can M 250 liter
12Tanks with capacity less than 150 m3N/AN/A
13Tanks with capacity more than 150 m3N/AN/A

One of our highly proficient team of Engineers in Iraq would be taking over this project.

Firefighting Foam Test, Control Valves Inspection in Malaysia

Enquiry:

Kindly quote us with your best price, availability, validity terms & condition for performing 5 year produced foam test accordingly to below requirement:

  • 5-Year Maintenance Test of Fixed Foam Extinguishing System covering Deck (Maker: NK/ Distribution Lines: 1/ Foam Monitors: 9)

·         five-Year Maintenance (according to last MSC.1/ Circ. 1432) including internal inspection of all control valves

·         all foam proportioners or other foam mixing devices to confirm that the mixing ratio tolerance is within +30 to -10% of the nominal mixing ratio defined by the system approval  à Produced Foam Sample to be taken. Do you have an approved lab for performing the 5-year produced foam test?

·         flush all high expansion foam system piping with fresh water, drain and purge with air

·         check all nozzles to prove they are clear of debris


One of our highly competent and certified lab would be taking over this project.