Transformer Oil Testing Tender, Oman

Enquiry:

We would like to invite you to participate in the tendering process for the subjected tender. 

Please find attached a detailed tender package and submit your best competitive proposal latest by the tender closing date, 14–August-2022, to Offices as per SOW/RFP requirements on or before 14:00PM (Oman Time).  

The table below indicate all parameters analysist.

S. No. Parameter Warning Level (Standard
reference)
Times
1 O2 (Oxygen) ASTMD3612 38
2 N2 (Nitrogen) ASTMD3612 38
3 CO2 (Carbon dioxide) ASTMD3612 38
4 CO (Carbon monoxide) ASTMD3612 38
5 H2 (Hydrogen) ASTMD3612 38
6 CH4 (Methane) ASTMD3612 38
7 C2H2 (Acetylene) ASTMD3612 38
8 C2H4 (Ethylene) ASTMD3612 38
9 C2H6 (Ethane) ASTMD3612 38
10 C3H6 (Propylene) ASTMD3612 38
11 C3H8 (Propane) ASTMD3612 38
12 DIELECTRIC
DISSIPATION FACTOR
ASTM D1816 gap1 3

13 RESISTIVITY OF
INSULATING OIL
ASTM D1169 38
14 ACID CONTENT OF
INSULATING OIL (BY
NEUTRALISATION)
ASTM D974 38
15 WATER CONTENT ASTM D1533 62
16 DIELECTRIC STRENGTH
OF INSULATING OIL
ASTM D149 62


One of our highly proficient and ISO certified laboratory would be taking over this testing.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Transformer Oil Testing in Beirut Lebanon

Enquiry:

We are in a need of transformer oil testing for two transformers in Beirut.

Please give me contacts from the laboratories that make this kind of testing, or send me an offer.

The offer should include the sampling and the inspection of the oil (GHA and DGA).


One of our highly proficient and ISO certified laboratory would be taking over this testing.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].


Transformer Oil Testing Contract, Kuwait

Enquiry:

Please provide your best offer prices for the attached request for the Transformer Oil Analysis,

Please consider the number of samples approximate 20,000 -/ to provide your best price offer.

Tests (For Transformer Oil Analysis)Test Method
AppearanceExamined Visually At Ambient Temperature
Visoos ty Ai 40 °cIS03 104 Or ASTM D445
Visoos ty At —30 °cIS03104 Or ASTM D445
Pour Point 0cIS03016 Or ASTM D97
Demity At 20 °cIS03675 Or ISO12185
Water ContentIEC.60814 Or ASTM D1533
Dielectric Strength (Breakdown Voltage)IEC.60156 Or ASTM D1298
Dielectric Dissipation Factm (DDF) At 90 °cIEC.6024
AcidityIEC.6202 1— l   Or ASTM D974
Aniline Point 0cASTM D66l
Interfacial Tension at 20°cISO,   6295 Or ASTM D971
Total Sulphur ContentBS 2000 Part 373 Or ISO 14596
Corrosive SulpherIEC.62534 And ASTM D I275 B
Inhibitor ContentIEC.60666
Fmrfural ContentIEC61 198
Oxidation StabilityIEC61125C, Telst Duration 164 Hour , If Inhibitor Content Is <0.01% (Note 1) IEC60247
Total Acidity
Sludge
-Dielectric Dissipation. Factm At 90°c
Flash PointISO2719
Polycyclo Aromatic Content (PCA)BS2000 Part 346
PCB ContentIEC61619

One of our highly proficient and ISO certified laboratory would be taking over this testing.

Should you have any similar requisites, do drop us email and we shall revert instantly -> [email protected].

Transformer Oil Testing in Abu Dhabi

Enquiry:

You are kindly requested to please quote for the subject job as per the details attached herewith as a SOW.

Scope of Work:
Transformers oil analysis and periodic condition monitoring testing
1 Yearly scope:
 The contractor is required to come to site and collect oil samples from all refilled power
transformers (40 units) by following IEC60475, IEC60567 AND ASTM D923-2015 standards
(Collecting samples using syringes)
 Oil samples should be analyzed by applying the following tests as per the standard for both oil
types we have mineral and Midel:

  1. Break Down Voltage
  2. Water Contamination test
  3. CO2/CO ratio
  4. O2/N2 ratio
  5. DGA test that should indicate the concentration of the following gases
    a) Hydrogen
    b) Methane
    c) Ethane
    d) Ethylene
    e) Acetylene
  6. DGA interpretation by applying the following techniques:
    a) Key Gases concentration
    b) Roger’s Ratio Fault Diagnostic
    c) IEC 60599 Ratio-Fault diagnostic
    d) Duval Triangle
    e) Duval/Lamarre Pentagon
  7. In addition, oil should be collected from Tap changer also and tested by following tests:
    a) Oil quality (BDV, Water)
    b) DGA test by applying Key Gas method and special DUVAL triangle for tap changers
  8. Furan Test that should reflect Degree of Polymerization (DP) and expected remaining paper
    age by years using Chendon model
  9. Corrosive Sulfur Test
  10. DBDS Test
  11. Free/Elemental Sulfur Test

One of our highly proficient and ISO certified laboratory would be taking over this project.

Should you have any similar requsites, do drop us email and we shall revert instantly -> [email protected].

Transformer Oil and Lube Oil Testing ADNOC

Enquiry:

Reference  to the above subject , Kindly note that —- Refining are inviting us to express our interest for providing lube oil and Transformer oil condition monitoring services to —- Refining facilities.

please go through attached brief Scope of Works / services  and requirement (this description is only for guideline and as a minimum requirement ) and advise if you are interested to bid through—— by providing the following :

  • confirmation  letter + company introduction .
  • capability to cover all necessary supervision, labor, tools, materials of consumable nature and diagnostic equipment required to perform the testing
  • have all the necessary experience, latest equipment, facilities and proven record of accomplishment of executing such type of Lube oil and Transformer oil analysis testing.

awaiting your kind response / reply  by return before on ———.  also , please find attached schedule of fees will be required for later stages based on scope of works.


One of our competent laboratory would be participating in this tender.

Transformer Oil Testing in Saudi Arabia

Enquiry:

Further reference to the captioned subject, we need to do the following test for the transformer oil before and after oil filling.

1. BDV

2. Water Content

3. DGA

4. Moisture Content

Hence, Kindly request you to provide your best price for the above test as earlier as possible to proceed further.


One of our competent laboratory in KSA would be taking over this project.

Contract Transformer Oil Testing in Qatar

Enquiry:

With reference to subject inquiry, we request you to submit your competitive offer for the scope defined below.


Scope of Work

  1. Transformer Oil Analysis – 8 samples

Below detailed parameters to be analysed for the sample oil.

Oil Analysis of transformers
Sl.NoDescription of parameters to be testedRemarks
 ADissolved Gas Analysis 
1Hydrogen
(H2) ( ppm)
 
2Methane (CH4)
(ppm)
 
3Ethane (C2H6) (ppm) 
4Ethylene (C2H4)(ppm) 
5Acetylene (C2H2)
(ppm)
 
6Carbon monoxide
(CO) (ppm)
 
7Carbon dioxide
(CO2) (ppm)
 
8Nitrogen (N2) (ppm) 
9Oxygen (O2) (ppm) 
10TDCG (ppm) 
11Rate change per day 
12Rate change per year 
 BOil Quality Analysis 
13Sample temp.
(°C)
 
14Moisture ( ppm) 
15Moisture
corrected
to 20(°C)
 
16% Saturation 
17% Saturation
Interfacial
Tension (mN/m)
 
18Acidity
(mgKOH/g)
 
19Colour number 
20Visual 
21Dielectric BDV
(kV)
 
22Power factor %
@
25°C
 
23Power factor %
@
90°C
 
24Specific Gravity 
25Viscosity 
26Sediment &
sludge
 
27Density 
28Particles 
29PCB 
30Corrosive
Sulphur
 
31DBDS 
Furan Analysis 
325-hydroxy-methyl-
2-furfuraldehyde (5HMF)
(ppm)
 
332-furfuraldehyde (2FAL)
(ppm)
 
342-Acetylfuran (2ACF)
(ppm)
 
355-methyl-
2-furfuraldehyde (5MEF)
(ppm)
 
362-fufuryl Alcohol (2FOL)
(ppm
 

Note: :

–          Sample to be Collected at Site

–          Containers for collecting the sample to be provided by the contractor

–          Detailed reports shall be produced within 7 – 10 days of the collection

–          Any recommendation or report shall be advised on the oil analysis.

–          Any Parameter is not feasible or you can recommend for alternative as per Transformer maker recommendations

S NoSubstation NameTransformer NumberHzTransformer Rating VoltageTypeRemarks
1Substation – Transformer – 150Hz50/60 MVA132/11 KVOil 
2Transformer – 250Hz50/60 MVA132/11 KVOil 
3Substation – Transformer – 150Hz900W415/30VOil 
4Transformer – 250Hz3200W415/40VOil
5Transformer – 350Hz3200W415/40VOil 
6Transformer – 450Hz2700W415/30VOil 
7Transformer – 550Hz2700W415/30VOil 
8Transformer – 650Hz2700W415/30VOil 

One of our highly capable and competent lab will be taking over this contract.